Annual Projects 2015-21

  • An essential piece of the 2015 bond provided about $33 million for smaller building improvement projects. These included things like upgrading and maintaining facilities throughout the school district to meet changing program needs, increase safety and prolong building life.

    These yearly projects were the result of a collaborative process. A comprehensive list was created by staff and parents, district facility, maintenance, operations and safety personnel, and then prioritized annually by the Capital Projects and Planning department. The aim is to keep buildings well maintained until major renovations take place, saving money in the long run. With projects ranging from new security vestibules to flooring upgrades, Spokane Public Schools is using taxpayer dollars wisely to create the best and safest learning environments for our students.

2019-20 Building Improvements

Adams

  • Capital improvements to grounds for new play structure
  • Capital improvements to drainage

Arlington

  • Capital improvements to playground black top

Audubon

  • Install flooring improvements in selected areas
  • Install window coverings

Balboa

  • Capital improvements to drainage

Bancroft

  • Upgrade HVAC system

Bemiss

  • Install flooring improvements in selected areas

Browne

  • Phase II upgrade to HVAC system

Bryant

  • Install electronic reader board

Chase

  • Remodel to create a bookroom in existing space

Cooper

  • Install selected sidewalk and fence improvements

District Admin Building

  • Construct all gender/family restroom on first floor
  • Install flooring improvements in building cafeteria

Ferris

  • Install landscaping improvements

Finch

  • Install blacktop between play structures

Garfield

  • Install water bottle filling stations

Garry

  • Upgrade select interior transaction windows and artwork display case

Grant

  • Install fencing improvements
  • Install water bottle filling stations and selected interior improvements

Hart Field

  • Phase I installation of selected sidewalk improvements

Hamblen

  • Remodel public office
  • Phase I painting to extend useful life

Holmes

  • Install selected sidewalk improvements

Hutton

  • Phase II install selected sidewalk improvements

Indian Trail

  • Install new siding on annex

ITSC

  • Reconstruct parking lot

Jefferson

  • Install new play structure
  • Phase I installation of selected sidewalk improvements

Libby

  • Install flooring improvements in selected areas
  • Capital improvements to EMS system

Lidgerwood

  • Phase II painting to extend useful life
  • Install additional exterior bells and speakers

Lincoln Heights

  • Install electronic reader board
  • Phase I painting to extend useful life

Logan

  • Capital improvements to grounds

Longfellow

  • Install flooring improvements in selected areas

Madison

  • Capital improvements to playground blacktop
  • Upgrade HVAC system

MAP Program at NC

  • Install roofing in selected areas

Montessori at Havermale

  • Install additional HVAC units

Moran Prairie

  • Install electronic reader board
  • Paint exterior to extend useful life

Mullan Road

  • Playground blacktop addition

North Central

  • Convert concession area to storage
  • Install new exterior doors

Pratt Academy

  • Install roofing in selected areas

Regal

  • Reconstruct playground blacktop and parking lot

Ridgeview

  • Phase II painting to extend useful life
  • Install flooring improvements in selected areas

Rogers

  • Capital improvements to historic facade

Roosevelt

  • Install selected sidewalk improvements

Shadle

  • Install water bottle filling stations

Sheridan

  • Capital improvements to grounds
  • Capital improvements to playground blacktop

Westview

  • Install selected sidewalk improvements

Whitman

  • Remodel public office
  • Apply sealant/anti-graffiti to exterior walls to extend useful life

Willard

  • Expand staff lounge and construct an office for itinerant staff

Woodridge

  • Apply sealant/anti-graffiti to exterior walls to extend useful life
  • Install flooring improvements in selected areas

Various Locations

  • Install clock and bell system
  • Install upgraded heat pumps
  • Install snow guards
  • Install security coil gates
  • Install water bottle filling stations
  • Capital improvements to irrigation systems
  • Install sensored faucets
  • Purchase and install new emergency generators
  • Install electronic mixing valves

2018-19 Building Improvements

Adams

  • Install flooring improvements in selected areas

 Arlington

  • Install flooring improvements in selected areas
  • Apply sealant/anti-graffiti to exterior walls to extend useful life

 Audubon

  • Phase II painting to extend useful life
  • Install water bottle filling stations

 Bancroft

  • Install flooring improvements in selected areas

 Bemiss

  • Install new play structure

 Browne

  • Upgrade HVAC system
  • Install capital improvements

 Bryant

  • Convert classroom to science room

 Chase

  • Install new heat pumps
  • Install new gym curtain

 Cooper

  • Install selected sidewalk improvements

 District Admin Building

  • Install new dividing door/partition in first floor meeting space

 Eagle Peak at Pratt

  • Install selected sidewalk improvements
  • Construct a vestibule

 Ferris

  • Install fencing improvements
  • Install landscaping improvements

 Finch

  • Install new dividing door/partition

FROC/STEP

  • Install steel landings and ramp
  • Install potable water and sewer to portable

 Garfield

  • Install capital improvements to grounds

 Garry

  • Refurbish locker rooms

 Glover

  • Phase I painting to extend useful life
  • Install water bottle filling stations

 Grant

  • Capital improvements to grounds

 Hamblen

  • Install new play structure
  • Upgrade clock and bell system

 Holmes

  • Install multi-media system

 Hutton

  • Install elected sidewalk improvements

 Indian Trail

  • Phase II painting to extend useful life
  • Install water bottle filling stations
  • Install ADA electronic access

 ITSC

  • Phase III capital improvements to interior
  • Install selected sidewalk improvements

 Jefferson (old building)

  • Upgrade boilers

 Jefferson

  • Install roofing in selected areas
  • Capital improvements to grounds

 Lewis & Clark

  • Convert library offices to computer lab

 Libby

  • Install new gym curtain
  • Install roofing in selected areas

 Lidgerwood

  • Capital improvements to exterior
  • Capital improvements to public office

 Lincoln Heights

  • Convert storage room to office space

 Logan

  • Install new play structure

 Longfellow

  • Capital improvements to interior
  • Apply sealant/anti-graffiti to

 Madison

  • Install fencing improvements

 MAP Program at NC

  • Capital improvements to grounds

 Montessori at Havermale

  • Install flooring improvements in selected areas
  • Upgrade HVAC system

 Moran Prairie

  • Capital improvements to grounds

 Mullan Road

  • Capital improvements to grounds

 North Central

  • Install multi-media system

 On Track Academy

  • Install flooring improvements in selected areas

 Regal

  • Upgrade fire alarm system

 Ridgeview

  • Phase I painting to extend useful life

 Rogers

  • Construct ballfield dugouts

 Roosevelt

  • Install flooring improvements in selected areas
  • Capital improvements to drainage

 Sacajawea

  • Modify public office

 Shadle

  • Install multi-media system

 Shaw

  • Install new trash compactor

 Sheridan

  • Install exterior lighting improvements
  • Modify public office

 Stevens

  • Install flooring improvements in selected areas
  • Install landscaping improvements
  • Upgrade heat pumps

 Support Services Center

  • Install fencing improvements
  • Capital improvements to drainage

 Various Locations

  • Install clock and bell system
  • Install structural improvements to concrete columns
  • Install upgraded heat pumps
  • Install snow guards
  • Install security coil gates
  • Capital improvements to irrigation systems
  • Install sensored faucets
  • Purchase and install new

 Westview

  • Install flooring improvements in selected areas
  • Capital improvements to grounds

 Whitman

  • Install flooring improvements in selected areas
  • Capital improvements to playground asphalt

 Willard

  • Install flooring improvements in selected areas

 Wilson

  • Install roofing in selected areas
  • Install selected sidewalk improvements

 Woodridge

  • Phase II painting to extend useful life
  • Capital improvements to drainage
  • Modify public office

2017-18 Building Improvements

Adams 

  • Installation of electronic reader board

Arlington

  • Installation of upgraded fire alarm system
  • Installation of electronic reader board

Audubon 

  • Phase 1 painting of public places
  • Improvements to grounds

Balboa

  • Reconstruction of playground asphalt
  • Expand on-site parking
  • Install ADA door operators

Bemiss

  • Exterior lighting improvements

Browne

  • Installation of multi-media system

Chase

  • Phase II exterior stucco restoration 

The Community School at Bancroft

  • Installation of window coverings 

Cooper

  • Installation of window coverings  

Eagle Peak at Pratt

  • Upgrade of HVAC system 

Garfield

  • Modification of public office

Garry

  • Installation of roofing in selected areas  

Glover

  • Installation of roofing in selected areas
  • Upgrade of clock and bell system  

Grant

  • Installation of window coverings 

 Hamblen

  • New play structure 

Hutton

  • Exterior lighting improvements
  • Improvements to grounds 

Indian Trail

  • Drainage improvements 

ITSC

  • Upgrade of boilers
  • Phase II improvements to interior  

Jefferson (Old Building)

  • Roofing improvements in selected areas
  • Upgrade door hardware

 Jefferson

  • Flooring improvements in selected areas
  • Fencing improvements  

Lewis & Clark

  • Sidewalk improvements
  • New HVAC chiller and compressors  

Libby

  • New playground structure
  • Sidewalk improvements 
  • Addition to parking 

Lidgerwood

  • Phase II structural improvements for exterior canopy 

Lincoln Heights

  • New exterior doors  

Logan

  • Phase II of painting
  • Improvements to grounds 

Longfellow

  • Phase I painting of public spaces
  • Flooring improvements  

Madison

  • Drainage improvements 

MAP Program

  • Installation of multi-media system 

Montessori at Havermale

  • Flooring improvements
  • Insulation of boiler room ceiling
  • Improvements to EMS system
  • Upgrade of HVAC system controls 

Moran Prairie

  • Phase I painting of public spaces
  • Flooring improvements
  • Upgrade of fire alarm system

North Central

  • Upgrade of boilers
  • Interior lighting improvements 

On Track Academy

  • Installation of roofing in selected areas 

Regal

  • New play structure 

Ridgeview

  • Improvements to grounds 

Rogers

  • Upgrade of boilers
  • Installation of fire sprinkler system
  • Conversion of room for functional purposes  

Roosevelt

  • Sealcoar of exterior walls
  • Modification of public office  

Sacajawea

  • Flooring improvements to selected areas
  • Upgrade of wiring and cabling for intercom system 

Shadle Park

  • Installation of multi-media system 

Shaw

  • Improvements to EMS system
  • Roofing installation in selected areas 

Sheridan

  • Sidewalk improvements 

Stevens

  • Sealcoat of exterior walls 

Various Locations

  • Installation of snow guards on roofs
  • Installation of upgraded heat pumps
  • Automatic flush valves
  • Security coil gates installation
  • Irrigation system improvements
  • Installation of sensored faucets
  • Purchase and install emergency generators 

Westview

  • Improvements to door hardware 

Whitman

  • New electronic reader board 

Willard 

  • Fire alarm system upgrades
  • Improvements to grounds  

Wilson

  • Drainage improvements 

Woodridge

  • Phase I painting of public areas

2016-17 Building Improvements

Arlington
  • Installation of tack boards in hallways
  • Phase I painting of classrooms to extend useful life
 
Balboa
  • Installation of upgraded heat pumps
 
Bancroft (The Community School)
  • Installation of electronic reader board
 
Bemiss
  • Roofing installation in selected areas
 
Browne
  • Installation of new intercom system
 
 
Chase
  • Exterior stucco restoration
 

Cooper

  • Select sidewalk improvements
 
Eagle Peak at Pratt
  • Capital improvements to playground asphalt
 
Ferris
  • Capital improvements to grounds
 
Garfield
  • Capital improvements to drainage
  • Upgrade of clock and bell system
 
Garry
  • Select sidewalk improvements
 
Glover
  • Capital improvements to EMS system
  • Fencing improvments
 
Grant
  • Modify public office
 
Hamblen
  • Capital improvements to grounds
 
Holmes
  • Flooring improvements in selected areas
 
Indian Trail
  • Installation of upgraded irrigation pump
 
ITSC
  • Capital improvements to interior
 
 
Lewis & Clark
  • Installation of foul ball netting
 
Libby
  • Phase I painting of classrooms to extend useful life
  • Installation of upgraded fire alarm system
  • Replace siding on portables
 
Lidgerwood
  • Structural improvements for exterior canopy
 
Lincoln Heights
  • Modify public office
 

Logan   

  • Phase I painting of classrooms to extend useful life
  • Modify public office
 
Longfellow
  • Modify public office
 
Madison
  • Capital improvements to EMS system
  • Fencing improvements
 
MAP Program at NC
  • Capital improvements to interior
 
Montessori at Havermale
  • Apply anti-graffiti sealant
 
Moran Prairie
  • Flooring improvements in selected areas

 

North Central
  • Installation of gym divider curtain
 
On Track Academy
  • Installation of upgraded heat pumps
 
Regal
  • Modify public office
  • Phase I painting of classrooms to extend useful life
 
 Ridgeview
  • Upgrade of HVAC system
 
Rogers
  • Convert room for functional purposes
 
Roosevelt
  • Capital improvements to playground asphalt
 
Sacajawea
  • Capital improvements to playground asphalt
  • Flooring improvements to selected areas
  • Installation of electronic reader board
 
Shadle Park
  • Installation of new bleachers at baseball field
  • Improvements of exterior lighting
 
Shaw
  • Modifications in commons area
 
Sheridan
  • Installation of upgraded fire alarm system
 
Stevens
  • Installation of new intercom system
 
Support Services Center
  • Reconfigure warehouse shelving
 
Various Locations
  • Painting of exterior of portables to extend useful life
  • Installation of upgraded heat pumps
  • Door re-finishing and/or replacement for security locks
  • Installation of automatic flush valves
  • Capital improvements to irrigation systems
  • Installation of water treatment system
  • Purchase and installation of new emergency generators
 
Whitman
  • Exterior lighting improvements
 
Willard 
  • Modify public office
 
Wilson
  • Roofing installation in selected areas
 
Woodridge
  • Capital improvements to playground asphalt

2015-16 Building Improvements

Adams
Capital improvements to staff restroom
 
Arlington
Flooring improvements in selected areas
 
Audubon
Installation of ADA electronic access
Capital improvements to exterior walls of building
 
Bancroft (The Community School)
Window tinting installation for energy efficiency
 
Bemiss
Sidewalk improvements in selected areas
Capital improvements to concrete wall
 
Browne
Flooring improvements in selected areas
 
Bryant (The Enrichment Cooperative)
Paint exterior to extend useful life
 
Chase
Apply anti-graffiti sealant
Install upgraded heat pumps
 
Cooper
Capital improvements to asphalt play area to extend useful life
 
District Administration Building
Capital improvements to building exterior
Install new fire alarm system
 
Ferris
Apply anti-graffiti sealant
 
Garfield
Flooring improvements in selected areas
Install new fire alarm panels
 
Garry
Install water fountains with bottle fillers
Paint exterior to extend useful life
 
Glover
Replacement of soffits and painting to extend useful life
 
Grant
Flooring improvements to selected areas
 
Hamblen
Sealcoat exterior concrete walls to extend useful life
 
Holmes
Capital improvements to grounds
 
Indian Trail
Installation of ADA electronic access
 
ITSC
Capital improvements to parking lot
 
Lewis & Clark
Upgrade theater lighting
Installation of new roofing in selected areas
Replacement of heat piping
 
Lidgerwood
Installation of acoustical treatment in selected rooms
 
Lincoln Heights
Installation of acoustical treatment in selected rooms
 
Linwood
Install upgraded master clock and bell system
 
Longfellow
Install electronic reader board
Paint exterior to extend useful life
 
Madison
Capital improvements to kitchen
 
MAP Program at NC
Capital improvements to parking lot
 
Moran Prairie
Sidewalk improvements in selected areas
Installation of upgraded emergency generator
Paint exterior to extend useful life
 
North Central
Apply anti-graffiti sealant
 
On Track Academy
Landscaping and signage improvements
Exterior lighting improvements
 
Pratt (Eagle Peak)
Upgrade of gymnasium lighting
Installation of new fire alarm system
 
 
Rogers
Installation of upgraded auditorium sound system
 
Roosevelt
Installation of new master clock and bell system
 
Sacajawea
Installation of new fire alarm system
Capital improvements to classrooms
Capital improvements to office
 
Shadle Park
Upgrading of irrigation system
 
Shaw
Installation of gym divider curtain
Replacement of soffits - phase 2
 
Sheridan
Flooring improvements in selected areas
Sealcoat of exterior concrete walls to extend useful life
 
Stevens
Installation of new master clock and bell system
Install power supply for fire alarm  horns
Install heat pumps
 
Support Services Center
Install 2 post vehicle lift at mechanics shop
 
Various Locations
Install automatic flush valves
Install new security coil gates
Capital improvements to irrigation systems
Install water treatment system
Install upgraded bell schedule system
 
Whitman
Install additional fencing around portables
 
Willard 
Capital improvements to landscaping and front entrance
 
Wilson
Installation of air conditioning - Phase 3
Installation of new doors
Paint exterior to extend useful life
 
Woodridge
Paint exterior to extend useful life